Northeast Florida Airport

Matthews Design Group (MDG) provided construction inspection services for various projects:

 

Spoil Island Removal: Project involved the removal and hauling of fill material from a dredge spoil island located near the airport. Project included the design and later removal of a temporary road with minimum impact to sensitive wetlands.

 

Taxiway B Construction: Project involved removal of large amounts of unsuitable material; and installation of mass stabilization, stormwater collection, and conveyance systems. These systems included geo-grids, geo-fabrics, and geofoam.

 

South General Aviation Hangar: Provided plan QA/QC, permitting support, and construction inspection services for new hangar, offices, and conference center at NFRA. This project was completed in 2010

 

Airport Rescue and Fire Fighting Facility: Provided plan QA/QA and permitting support for the NFRA-ARFF.

 

Since work was adjacent to active runways, constant coordination with air and surface control was required.  Engineering services also included weekly and storm event erosion control inspections.

Services Provided

 

  • Construction inspection and support

  • Stormwater and erosion control inspections

  • Permitting with St. Johns County, and St. Johns River Water Management District

Matthews Design Group | 7 Waldo Street, St. Augustine, FL 32084 | P: 904.826.1334
Copyright© 2017. Matthews Design Group, Inc. All rights reserved.

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle
  • email-icon
  • Facebook - Grey Circle
  • LinkedIn - Grey Circle
  • email-icon